Skip to main content
Fig. 5 | BMC Nephrology

Fig. 5

From: Construction and validation of a predictive model for malignant tumors in patients with membranous nephropathy

Fig. 5

Calibration curves for the predictive model. (A) Training cohort. (B) Validation cohort. The X-axis represents the predicted probability, and the Y-axis represents the actual occurrence probability. The diagonal dashed line labeled ā€œIdealā€ represents the ideal scenario where the predicted probabilities match the actual probabilities. The dashed line labeled ā€œApparentā€ represents the consistency between the predicted probabilities (calculated once based on the model) and the actual probabilities, while the solid line labeled ā€œBias-correctedā€ represents the result after bootstrapping the data used to construct the model

Back to article page